Atura Power was selected to build a new battery energy storage system (BESS) next to its Napanee Generating Station by Ontario's Independent Electrici...
Read the Province of Ontario's plan to accelerate and sustain a low-carbon hydrogen economy.
The Hamilton-Oshawa Port Authority entered a Memorandum of Understanding with Atura Power to provide green hydrogen.
Atura Power selected Cummins Inc. to design and manufacture a 20 MW electrolyzer system for its Niagara Hydrogen Centre in Niagara Falls, Ont.
Atura Power selected CEM Engineering and Sacré-Davey Engineering to advance the engineering of Atura Power’s Niagara Hydrogen Centre.
Atura Power has signed an agreement with Imperial to study the potential for hydrogen production in Nanticoke, Ontario.
Atura Power and Plains All American announced a MOU to conduct a low-carbon hydrogen and subsurface storage feasibility study.